|
Labeled drawings of the SEPICA Collimator, Analyzer, and Proportional Counter
|
|
Labeled drawings of the SEPICA Detector Components
|
S3DPU: Data Processor for the SEPICA Instrument |
|
Rear View of SEPICA: High Voltage Supply (left) E-Box (middle) Isobutane Tank (right)
|
|
|
Preparation for integration at GSFC. Thermal Radiator, Test Manifold, & Aperture Visible
|
|
Early ACE Integration at APL |
SEPICA during the hoist onto the spacecraft... |
|
...and after its installation.
|
|
|
S3DPU Final Integration at Kennedy Space Center
|
|
Isobutane Valve Knob Removal
|
|
|
SEPICA on NASA's ACE Observatory
|
|
|
ACE, within its Delta II launch vehicle, on the night before the launch...
|
|
... and liftoff! (after a one-day delay caused by unauthorized boats in the Kennedy Space Center's waters)
|